W Hotel KAFD guest bathroom — aluminium and glass partition installation by Nikken Møller
Hospitality Fit-Out · Glass & Partition Installation, Snagging & Handover

W Hotel — KAFD, Riyadh

Complete installation, snag rectification and final handover of interior glazing and partition systems across guest floors 0–10 — glass partitions, sliding partition systems, sliding doors including bathtub sliding doors, WC doors and dressing unit glass fixtures — delivered by Nikken Møller for a W-branded hotel development in King Abdullah Financial District.

Kafah logoClient: Kafah Location: KAFD, Riyadh Floors: 0–10 Scope: Installation, Snagging & Handover
0–10
Floors Covered, Ground to 10th
~24–25
Rooms per Floor, Repetitive Layout
KAFD
Project Location, Riyadh
100%
Installation, Snagging & Handover
Project Overview

Interior glazing & partition installation, snagging and handover for a W Hotel in KAFD

Nikken Møller — through Ayfa International Company — was engaged for the complete installation, snag rectification and final handover of interior glazing and partition systems across guest floors 0 to 10 of a W-branded hotel development inside King Abdullah Financial District (KAFD), Riyadh, one of the city's most prestigious business and hospitality addresses. Each floor holds approximately 24 to 25 guest rooms with identical, repetitive layouts across all units.

The scope covered five core work categories — glass partitions (fixed panels and single partitions), sliding partition systems, sliding doors (including bathtub sliding doors), WC doors, and dressing unit glass fixtures — broken down into ten distinct door and glass partition types on the approved bill of quantities, each installed to a hotel-grade standard of fit and finish across every guest floor from the ground floor to floor 10.

Materials were supplied by the client and received into a dedicated on-site storeroom. Nikken Møller then carried out 100% of the installation progressively, floor by floor and room by room, with every item tracked through defined completion stages — supports and track, door and panel fixing, architrave, first snagging and final handover — so quality was checked and signed off at each step before a room was closed out.

Project Facts

ClientKafah
Project SiteW Hotel, KAFD
LocationKing Abdullah Financial District, Riyadh
Scope100% Installation, Snagging & Handover
Material SupplyProvided by Client
Floors Covered0–10 (Ground to 10th Floor)
Rooms per Floor~24–25 (Repetitive Layout)
Door & Glass Types10
Installed ByNikken Møller — Ayfa International Co.
Scope of Work

A staged, quality-checked installation process

Every door and glass partition type moved through the same four installation stages, giving a single, accountable process across every guest bathroom on site.

1

Supports & Track

Structural mounting supports and sliding track systems fixed in place ahead of door and glass installation.

2

Door & Panel Fixing

Aluminium-framed glass doors, fixed panels, mirrors and bathtub enclosures installed to line and level.

3

Architrave & Trims

Architraves, trims and mirror-backing panels fitted for a seamless, hotel-grade finish.

4

Snagging & Handover

First snagging inspection followed by final handover, tracked and approved room by room.

Partition & Door Types

Ten aluminium & glass item types installed across floors 0–10

Every item on the approved bill of quantities was tracked and installed to the same finish standard across every guest floor, from bathroom sliding doors to entrance mirrors.

D2
Bathroom sliding doorSupports, track, door & architrave
D3A
Bathroom WC door & fix panelDoor with fixed side panel
D3B
WC doorStandalone WC door unit
P2
Fixed glass panelFramed fixed glass screen
P1
Bathtub sliding doorSupports, track & bottom glass
D8
DressDressing-area sliding door
D9
Bathtub sliding doorDoor & fix panel assembly
D14
Bathtub sliding doorDoor & fix panel assembly
—
Entrance mirrorMDF-backed mirror with trims
—
DB panelBacking, panel & mirror assembly
Our Process

From bill of quantities to final handover

A structured, progress-based process kept installation, invoicing and quality control aligned across the whole site.

1

BOQ & Price Confirmation

Bill of quantities, price list and payment terms confirmed for every door and glass partition type before mobilization.

2

Material Logistics

Client-supplied aluminium and glass components received and secured in a dedicated on-site storeroom ahead of installation.

3

Progressive Installation

Supports, tracks, doors, panels, mirrors and architraves fitted room by room across guest floors 0–10.

4

Snagging & Handover

First snagging review and final handover, with completion verified and approved on every item.

The Design Brief

The hospitality finish the installation was built to support

The guest bathroom and bedroom design intent for the W Hotel KAFD development — the standard every aluminium and glass partition installed by Nikken Møller was measured against.

W Hotel KAFD guest bathroom design intent — marble, glass partition and rainfall shower
Guest Bathroom — Design Intent
W Hotel KAFD guest room design intent — bedroom with glass-fronted bathroom
Guest Room — Design Intent
Site Walkthrough

Video from the guest floors

Short walkthrough clips of the aluminium and glass partition installation at W Hotel, KAFD.

Installation Walkthrough — Clip 1
Installation Walkthrough — Clip 2